This job is closed — reopen to make further changes.
Jobs
Show:
Job
ISO Canvas
Job name is edited from the job page.
Show on canvas
Dimension mode · this drawing
Select— click to select, drag to movex – y – · dwg – , –
DraftingNB — SCH 40
Drafting defaults — new elements
Units
Class
Schedule
SnapGrid100%
100%
Keyboard shortcuts
UndoCtrl + Z
PanSpace
ZoomScroll
DeleteDel
CancelEsc
Fit to drawingF
Rotate a fittingRe-click it
Nothing selected.
Click an element to edit properties.
Switch to BOM tab to see the Bill of Materials.
Properties · BOM]
New Pipe Run
Leave blank to assign later
Concentric Reducer
Next pipe run defaults to outlet size
Revision Cloud
Text Note
Save conflict
This item changed again while you were deciding.
Close job — not MDR-Ready
Line Specifications
Line No
Size
Pipe Class
Schedule
Service
Category
Welder Management
Name
Stamp
Qualified WPS
Cert Expiry
WPS No
Rev
Process
Base Mat Group
Filler Material
Thickness Range
Position
PWHT
PQR Ref
No WPS entries yet. Click + Add WPS to add a Welding Procedure Specification.
Test Packs & Calibration
Pack No
System / Lines
Test Medium
Test Pressure
Hold Time
Gauge Cal Ref
Test Date
Witnessed By
Result
Remarks
Witness Cert
No test packs yet. Click + Add Test Pack to create one.
Instrument ID
Description
Serial No
Calibration Date
Due Date
Cert Reference
Remarks
No instruments yet. Click + Add Instrument to register a gauge or instrument.
Drawing Markup
For weld mapping of client-supplied drawings — upload a contractor isometric or P&ID and place weld callouts directly on the drawing.Page 1 / 1Upload a client-supplied isometric or P&ID drawing, then place weld callouts on it.
No isometric uploaded for this drawing. Use the button above to upload a scanned PDF or image.
Add Weld✕
NDT
Notes / Remarks
Material Map
Page 1 / 1Upload a drawing, then place material callouts linked to your material register.
No drawing uploaded for this drawing. Use the button above to upload a scanned PDF or image.
Add Material✕
Inspection & Test Plan
Inspection Activities0 items
No ITP items yet — click Generate from Code… to pre-populate from ASME B31.3, B31.1, AS 4343, or other standards, or + Add Item to build manually.
#
Activity
Reference
Type
Acceptance Criteria
Verified By
Date
Status
Project Setup
MDR
Cover Page Details
Package Completeness
Master Drawing Register
Design Verification Document
Certificate of Inspection
Heat Certificates / Mill Certs
NDT Tracking
NDT requirements per line (ASME B31.3 defaults by fluid service category — override as needed).
VT is always 100%. Use Select Random to assign random welds for spot NDT across all drawings.
No lines found in this job. Add line numbers to pipe runs on the ISO canvas.
Line No
Category
Welds
RT %
RT Progress
UT %
UT Progress
PT %
PT Progress
MT %
MT Progress
VT
VT Progress
Actions
Material Register
#
Description
Size
Material Grade
Heat No
Cert No
Cert Doc
Supplier
Date Received
Notes
On Dwgs
No items yet. Click + Add Item to add manually, or Import CSV to bulk import from an existing cert log.
Company WPS Library
Shared across all jobs — use the Save to company library action on any job WPS to add it here
Company Welder Registry
Gauge Register
Calibrated instruments with cal-event history — shared across all jobs
NDT Reports
Inspection reports covering welds on this job — RT / UT / PT / MT / VT
Consumable Filler Batches
Wire and rod batches with MTR traceability — shared across all jobs